Port of San Francisco April 2018 Pier 70 Shipyard Request for Proposals #2
Required Submittal Documents
- Port Leasing Application (RFP Appendix F)
- Statement of Ability to Comply with City and Other Governmental Requirements and Agreement to Conditions (RFP Appendix H)
Shipyard Site Information
- Shipyard Site Proximity Map (RFP-2 Appendix A-1)
- Shipyard Site Details Map (RFP-2 Appendix A-2)
- Shipyard Site Equipment List and Locations Map
- Surrounding Pier 70 Area District Summary (RFP Appendix M)
- Shoreside Power System As Builts
- Scope of Pier 68 Area Electrification Project Work to be Funded and Completed by Port as Shipyard Site Preparation for New Operator
Shipyard Conditions Surveys
- Building 6 Update of Structural & Geotechinal Condition Assessment – COWI | OLMM Joint Venture & GTC Inc. (March 2017)
- Rapid Condition Survey for Buildings 6 (March 2007)
- Rapid Condition Survey for Building 36 (May 2013)
- Pier 68/70 Building Condition 2017 Addendum to the 2015 Assessment [Moffat & Nichol | AGS Joint Venture (July 2017)] ─ Executive Summary; Bldg.19; & Bldg.36
- Pier 68/70 Building Condition 2017 Addendum to the 2015 Assessment [Moffat & Nichol | AGS Joint Venture (July 2017)] ─ Bldg.58 & Bldg.68
- Pier 68/70 Building Condition 2017 Addendum to the 2015 Assessment [Moffat & Nichol | AGS Joint Venture (July 2017)] ─ Bldg.103; Bldg.105; & Bldg.107
- Pier 68/70 Building Condition 2017 Addendum to the 2015 Assessment [Moffatt & Nichol |AGS Joint Venture (July 2017)] ─ Bldg.108
- Pier 68/70 Building Condition 2017 Addendum to the 2015 Assessment [Moffatt & Nichol |AGS Joint Venture (July 2017)] ─ Bldg.109; Bldg.111; Bldg.120; Bldg.121; Bldg.127; Bldg.143; Bldg.250; & Bldg.251
- Pier 68/70 Shipyard Condition Survey, Civil Site Utilities Report – [Moffatt & Nichol |AGS Joint Venture (July 2017)]
- Pier 68/70 Shipyard Condition Survey, Electrical Power Systems – [Moffatt & Nichol |AGS Joint Venture & HRA Consulting Engineers (August 2017)]
- Shipyard Electrical Single Line Drawing 44”x34” – [Moffatt & Nichol |AGS Joint Venture & HRA Consulting Engineers]
- Pier 68/70 Shipyard Condition Survey, High-Value Equipment Inventory – [Moffatt & Nichol |AGS Joint Venture (July 2017)]
- Pier 68/70 Shipyard Condition Survey, High-Value Equipment Inventory Excel Spreadsheet– [Moffatt & Nichol |AGS Joint Venture (July 2017)]
- Pier 68/70 Shipyard Condition Survey, Marine Structures – [Moffatt & Nichol |AGS Joint Venture (July 2017)]
- Pier 68/70 Shipyard Condition Survey, Mechanical Site Utilities – [Moffatt & Nichol |AGS Joint Venture & HRA Consulting Engineers (July 2017)]
Dry Dock Reports
- Valuation of Port of San Francisco Dry Dock #2 - Southport Atlantic (January 2018)
- Valuation of Port of San Francisco Dry Dock Eureka - Southport Atlantic (January 2018)
- Dry Dock #2 Structural Assessment Report – GHD | Telamon Joint Venture & Collins Engineers (August 2017)
- Dry Dock Eureka Structural Assessment Report – GHD | Telamon Joint Venture & Collins Engineers (June 2017)
- Dry Dock 2 Ultrasonic Thickness Inspection – DRS Marine, Inc. (July 2016)
- Dry Dock Eureka UT/VT Survey – International Inspection (May 2015)
- Dry Dock No. 2 Dolphin & Stair Tower Inspection – Triton Engineers, Inc. (August 2016)
- Request for Heger Certification of Dry Dock No. 2 Located at BAE San Francisco – Heger Dry Dock, Inc. (December 2016)
- Dry Dock No.2 Analysis of Wingwall Shell Plate as Surveyed Thicknesses – Bruce S. Rosenblatt & Associates, LLC (December 2016)
Dredging Reports, Permits and Site Bathymetry
- Puglia Shipyard Facility ─ 2017 Maintenance Dredging Planning-Level Costs– Anchor QEA, LLC (January 2017)
- BAE Systems SFSR ─ Integrated Alternatives Analysis & 2014 Dredging Program– Anchor QEA, LLC (March 2014)
- SF Drydock Bathymetric Survey – GBA Engineering (April 2017)
- SF Drydock Bathymetric Survey – GBA Engineering (June 2016)
- Maintenance Dredging Episode Approval – BCDC Permit No. M1993.013.08 (August 2014)
- BAE Systems Maintenance Dredging Permits – US Army Corps of Engineers File Number 400192S (June 2008)
- Water Quality Certification, Maintenance Dredging at BAE SFSR – San Francisco Bay Regional Water Quality Control Board (July 2014)
Environmental
- Shipyard Site Inspection Tour Requirements (to be held week of May 7, 2018)
- Generic Asbestos Notice to Employees
- Pier 70 Shipyard Asbestos Notice to Employees
- List of Environmental Reports and Documents Regarding Hazardous Materials (August 2017)
- BAE Systems San Francisco Ship Repair, Inc. Level 1 Exceedance Response Action (ERA) Report
- Pier 70 Risk Management Plan
- Pier 70 Risk Management Plan – Appendix C
- Federal Emergency Management Act Disclosure Notice
Additional Documents
- Proposed Form of Lease (RFP Appendix F)
- Inspection Tour Requirements for Pre-Proposal Conferences/Site Visits during week of May 14, 2018 (Appendix K)