The U.S. Army Corps of Engineers (USACE), in collaboration with the Port of San Francisco and the City of San Francisco, has reached an important milestone in the San Francisco Waterfront Coastal Flood Study (Flood Study) - the release of the Draft Integrated Feasibility Report and Environmental Impact Statement (Draft Report and EIS).
The following Draft Report and EIS documents are available for download and review:
Appendix A: Plan Formulation (PDF)
Appendix B: Engineering Appendix (PDF)
- Sub-Appendix B.1: Hydrology, Hydraulics and Coastal (PDF)
- Attachment B.1.1: Coastal Extreme Water Levels and High Tide Flooding (PDF)
- Attachment B.1.2 (Part 1): Future Without Project and Future With Project Maps (PDF)
- Attachment B.1.2 (Part 2): Future Without Project and Future With Project 2040 Only Maps (PDF)
- Attachment B.1.2 (Part 3): Total Net Benefits Plan Maps (PDF)
- Attachment B.1.3: Wave Overtopping Sensitivity Assessment (PDF)
- Attachment B.1.4: Hydrology and Hydraulics Interior Drainage Analysis (PDF)
- Attachment B.1.5: Shallow Groundwater (PDF)
- Sub-Appendix B.2: Coastal Life-Safety (PDF)
- Sub-Appendix B.3: Earthquake Life-Safety and Resilience (PDF)
- Sub-Appendix B.4: Array of Alternatives (B-G) Plan View Figures (PDF)
- Sub-Appendix B.5: Total Net Benefits Plan (TNBP) and Independent Measures for Consideration Plan View Figures (PDF)
Appendix C: Cost Engineering (PDF)
Appendix D: Environmental and Cultural Resources (PDF)
Appendix E: Economic and Social Considerations (PDF)
Appendix F: Real Estate Plan (PDF)
Appendix G: Monitoring and Adaptation Plan (PDF)
Appendix H: Public Involvement (PDF)
Appendix I: Engineering with Nature (PDF)
Appendix J: Climate (PDF)
Appendix K: Mitigation (PDF)