Part B. Transition Plan Project List

The following is the preliminary list for Port of San Francisco ADA Transition Projects for 2003 through 2005.

1. Under each of the four basic categories, this list is in alphabetical order.

2. If an item has a date of 2003-2004 or 2004-2005 in the Status column – this task is currently funded through Capital Authorization in the Port’s Transition Plan.

3. TBD = To be determined

4."Costs not captured under this project" means the cost it to be borne by the responsible agency and this may not be the Port.

5. Architectural barriers that have been confirmed as a tenant responsibility have been removed from the Port’s list of architectural barriers, and the item has been specifically addressed with the Tenant by the ADA coordinator.

Administrative Services

Location

Item

Approximate cost

Status

Responsible entity

Embarcadero

Art Ribbon pylons and informational displays lack alternate formats for text and pictures.

Costs not captured under this Capital No.

TBD

San Francisco Arts Commission

Ferry Building

Second Phase Talking Signs in public accommodation areas

$65,000

Funding denied for 2004-2005 pending usage rate study

Port

Ferry Terminals

Add "easi-read" tactile informational signs at intercom unit

$500

2004

Port

Fisherman’s Wharf Port History Walk Signage

Port History Walk signage and informational displays lack alternate formats for text and pictures

$40,000

TBD

Port

Pier 1

Talking signs maintenance and functionality

None

Completed.

Pier 1 building maintenance

Pier 1

TTY unit replacement

$700

Completed

Port

Pier 1

History wall, informational displays lack auxiliary aids and alternative formats for text and pictures

TBD (Included in Fisherman’s Wharf History Walk Signage)

TBD

Port

Administrative Services

Location

Item

Approximate cost

Status

Responsible entity

Pier 1

Public conference room door opening force exceeds 5 pounds

None

Completed.

Pier 1 building maintenance

Pier 1

Public elevator lobby door opening force exceeds 5 pounds upon exiting

$12,000

TBD

Port

Port Wide

Accessible web site

$42,500 consultant

$2,400 software

$13,000 staff training

2003-2004

Port

Port-Wide

Public meeting and advisory group accessibility notices added to web

Included in Port operating labor costs

Completed, staff training

Port

 

Open Space and Recreation

Location

Item

Approximate cost

Status

Responsible entity

Ferry Building, Pier 7 and South Beach Harbor Breakwater Pier

Accessible fish washing sink

$4000 materials

$4000 labor

Requested funding in 2004-2005

Port

Ferry Building, Pier 7 and South Beach Harbor Breakwater Pier

Accessible fishing pier railing (lower to 34" maximum height and 30" minimum width) in multiple locations at each pier (2 minimum) (Ferry Building may be transferred to BART Scope)

$11544 each for a total of $69,264

TBD stage with other projects at that specific site or by 2005. Issue of fall protection must be addressed.

Port

Fisherman’s Wharf

Triangle open space, Taylor Street and Embarcadero Street frontage and sidewalks

Costs not captured under this Capital No.

Part of Fisherman’s Wharf Triangle development project

(Transition plan will address interim accessibility issues that are readily achievable)

Port

Jefferson Street from Powel to Mason eastern sidewalk

Sidewalk deterioration and buckling

TBD- Portion to be funded out of $100,000 2004-2005 budget, and the remainder leveraged into a new capital project required for 2005.

Currently under assessment

Port

Jefferson Street From Mason to Leavenworth eastern sidewalk

Sidewalk deterioration, buckling and tree wells

TBD- Portion to be funded out of $100,000 2004-2005 budget, and the remainder leveraged into 2005 capital project

Currently under assessment

Port

Jefferson Street from Scomas to Leavenworth western sidewalks

Excessive sidewalk cross-sloping grades, 3 buildings with stepped entries and two with sloped entries with no landings at entry doors.

TBD- Portion to be funded out of $100,000 2004-2005 budget, remainder leveraged into 2005 capital project

Currently under assessment

Port

 

Open Space and Recreation

Location

Item

Approximate cost

Status

Responsible entity

Inner Harbor walkways behind Taylor Street restaurant frontage

Inner harbor walkways require one ramp to be re-poured for a 1:12 maximum slope, add ramp hand rails and provide blockages to areas that are sloped beyond 1:12

$137,750

Currently under assessment

Port

Pier 45

East Apron accessible route surfaces

$200,000 TBD funding from Fisherman’s Wharf parking Lot funds, Costs not captured under this Capital No.

Part of grant funding for Pier 45 – 2003-2004, Triangle Parking Lot fund

Port

Fireman’s Plaza

Park replacement, accessible routes and furniture

Costs not captured under this Capital No.

Planned and funded for 2005

CCSF MUNI

Tulare Park

Park replacement, accessible routes and furniture, accessible route from Illinois

Costs not captured under this Capital No. (approximately $400K)

Planned and partially funded

Port

Islias Creek Landing

Accessible picnic table (now located on gravel), parking blocking sidewalk

$1562

TBD – to be leveraged to Port Maintenance

Port

Heron’s Head Park

Accessible parking re-striping and clearance of entry path, Maintenance of decomposed granite path (deferred maintenance)

$5000 materials

$5000 labor

2004-2005 – to be leveraged to Port Maintenance

Port

Heron’s Head Park

Signage, informational displays lack alternate formats for text and pictures

$7,123

TBD

Port

Pier 7

½ inch gaps at wood deck and expansion joints and rough surface on deck checking (deferred maintenance)

$3137 for seismic joint, $73,865 for sanding concept, and $881,847 for deck replacement

Planned for 2004-2005 budget, currently under study

Port

Hyde Street Pier

Construction error on gate design – lacks 32 inch clear door panel

TDB- $8000 to replace gate

TBD

Port

 

Open Space and Recreation

Location

Item

Approximate cost

Status

Responsible entity

Pier 52

Accessible gangway and boat launch float

$90,000 and $1,000,00 for breakwater, Costs not captured under this Capital No. Cost projected at $433,151 for alternate project, if the previous project does not go forward.

Gangway is funded, breakwater TBD

Port and CCSF DPW

Agua Vista Park

Paving path to pier, accessible street parking and curb ramps, and accessible bench

Conducted as Port Maintenance Work Authorization, capitalized and in Port operating costs.

Currently under construction and funded through Port Maintenance

Port

Warm Water Cove

Paving of paths and accessible picnic table

Conducted as Port Maintenance Work Authorization in Port operating costs.

Completed

Port

Warm Water Cove

Accessible Parking

$222

2004 to be leveraged to Port Maintenance Department

Port

 

Public Rights Of Way

Location

Item

Approximate cost

Status

Responsible entity

Port-wide

Provide TTY positioning information on City Map signs

Costs not captured under this Capital No

TBD

CCSF and Deaux

Port-wide

Miscellaneous curb ramp repairs, grind off 1/2" lip, add miscellaneous curb ramps in China Basin Area, add detectable warning tactile domes

Costs TBD and partially not captured by this project

Multiple delivery dated based on project and MOU's

Port, MUNI, DPW and Mission Bay Development

Embarcadero at Washington Street

Pedestrian controls out of reach range

$2959 for 4 units

2004-2005

Port and DPW

Ferry Terminal

Brow ramps - modify and add hand rails, modify gangway and brow ramp bridge plate. Add two signs. (fabric gates and hand rail protruding object addressed in TSA Security Grant project)

$8200 materials and Port maintenance absorbs $67322.11 in labor

Design work completed and issued for Port Maintenance Work Order estimate.

Port and Red and White

Ferry Building

Reset tree well stones and provide a level surface with the sidewalk, or place tree grates at tree wells

TBD

TBD

CCSF DPW

Cargo Way

Sidewalk and plant overgrowth, and three curb ramps. Minimum of 500 feet of sidewalk replacement required. Deferred Maintenance.)

$306,621

2005-2006 and Port Maintenance

Port

Fisherman’s Wharf

Accessible Parking at Pier 45, cross slopes and signage, relocate parking spaces across Embarcadero

$222 per unit or $666

2003-2004

Port

Hyde Street

Restoration of pedestrian route to Hyde St Pier, accessible parking reconfiguration.

Port labor only.

Completed by Port Maintenance

Port

Hyde Street

Repaint Hyde Street Pier accessible parking space. Gate to have 32" leaf – 8 ½ pounds pressure

Port labor only.

Gate $222

Completed by Port Maintenance

Port

Jefferson Street

4 tenant entries require ramped access

$40,000 total

2003-2004

High priority

Port

Public Rights Of Way

Location

Item

Approximate cost

Status

Responsible entity

Illinois Street Curb at 25th to Caesar Chavez

Curb ramps not installed on east side of street

Costs not captured under this Capital No

Project is currently under permit approval process

Muni project

Jefferson Street

Curb ramp fills, grinds and sidewalk crack and tree grate repairs on accessible routes

$358,980

2003-2004, to be leveraged to Port Maintenance

Port

Port-wide

Accessible street parking plan, painting and signage

$10,000 materials

$10,000 labor

($780 per unit)

Requested funding in 2004-2005

Port or is this CCSF DPW?

Port-wide

Retrofit curb ramps with detectable warning tiles

$1414 per unit or approximately $282,800 or %502,500 including additional curb ramps.

TBD waiting on SF determination of program. All new street intersection curb ramps built by Port or MUNI will have detectable warnings

Port, Public Works, City of San Francisco, SF Redevelopment Agency

Port-wide

Provide audible pedestrian crosswalk controls

Costs not captured under this Capital No. Cost depends on equipment to be specified by CCSF and the condition of the cross walk hardware at that particular location.

TBD waiting on SF determination of program. All new street intersection curb ramps built by Port or MUNI will have detectable warnings

Port, Public Works, City of San Francisco, SF Redevelopment Agency

PUC Promenade

Accessible route access from Tennessee

Costs not captured under this Capital No

Completed

Public Works and PUC

Terry Francios Blvd.

Cross walk at China Basin Park

$10,092 materials

$ 12,242.50 labor

Completed

Port

Terry Francios Blvd.

Sidewalks and crosswalks on west side

Costs not captured under this Capital Number

Under design and construction

SF Redevelopment Agency

 

Public Rights Of Way

Location

Item

Approximate cost

Status

Responsible entity

Terry Francois Blvd.

Sidewalks on east side by Ramp restaurant to Agua Vista Park

%53,763

2004-2005 concurrent with adjacent development and re-routing of Terry Francois Boulevard

Port

Terry Francois Blvd. and Pier 52

New parking, sidewalks, curb ramps and park replacement

$780,000 under other capital number

Completed

Port and DBW

Third and Cargo Street

Sidewalk repairs and intersection curb ramps

Costs not captured under this Capital No

Committed

CCSF Muni

Old Admin Building Pier 27/29

Lack of access to elevated ground floor, entrance, and corridors

Costs not captured under this Capital No.

Building is slated for removal as part of Pier 27/29 recreation pier project

Port and private developer

 

Tenant Relations, Port as Landlord

Location

Item

Approximate cost

Status

Responsible entity

Ferry Terminal

Intercom signage replacement and alternate signage for Pier 14

$3,500

2004-2005

Port

Office Building Pier 50

Lack of access to elevated ground floor entrance and corridors

$19,935

TBD, planned for design 2004, may be leveraged to Port Maintenance

TBD

Office Building Pier 50 Toilets

Toilets are not accessible. Building signage required.

$62,830

TBD

Port or through Tenant Path of Travel Requirements

Agriculture Building

Door hardware, ramp handrails, and signage.

$23,828

Planned for 2004-2005 budget. (Note building is to be leveraged for a major alteration 2005—2006).

Port

Agriculture Building

Common area second floor toilets and vertical access

Costs not captured under this Capital No. Estimated $156,294

To be leveraged into project redevelopment slated for 2007

Port or developer

Hyde St Pier

Reverse toilet room doors to correct doors’ clear floor areas

Costs not captured under this Capital No.

Completed

Port

Pier 35 Cruise Terminal

Barrier removal in two existing restrooms and drinking fountain

$65,000

2003-2004

Port

Pier 35 visual alarms

Add visual alarms in areas not covered by the TSA Security grant scope

$41`346

2005-2006

Port

Pier 9

Toilet replacement with unisex

Costs not captured under this Capital No.

2003-2004

Tenant and Port Maintenance

Pier 9

Install physical barriers to prevent parked autos from blocking tenant entry door required clearances

Costs not captured under this Capital No.

Parking is completed, barricading is in process

Port

South Beach Harbor

Accessible gangways

Costs not captured under this Capital No.

In for permitting

SF Redevelopment agency

South Beach Harbor

Curb ramp in accessible parking and parking with excessive cross slope

Costs not captured under this Capital No.

TBD under review

SF Redevelopment agency

 

Tenant Relations, Port as Landlord

Location

Item

Approximate cost

Status

Responsible entity

South Beach Harbor

Toilet rooms with hardware and accessories barriers

Costs not captured under this Capital No.

TBD under review

SF Redevelopment agency and South Beach Harbor Maintenance